Tennant Avenue Sewer Main Project

The City's current Sewer Master Plan identifies the existing 18-inch sewer pipe within Tennant Avenue between Monterey Road and Railroad Avenue as deficient under peak flow conditions and recommends that it be increased in size to prevent sewer overflows within this segment of the City's sewer system. The project is included in the adopted FY18-19 through FY 2023-24 Capital Improvement Program. 

The scope of work includes removal of the existing sewer pipe and installation of new 27-inch sewer pipe, auger bore under the Union Pacific Railroad tracks, temporary sewer bypass system, new manholes and/or manhole modifications, manhole coating, lateral reconnections, traffic control, project clean up and video for quality control.

The City of Morgan Hill has contracted with K.J. Woods Construction, Inc. to install a new sanitary sewer main on Tennant Avenue between Monterey Road and Railroad Avenue. No interruption of sanitary sewer service is expected. This critical infrastructure project is needed to ensure the City’s Sewer System is proactively maintained and that an aging sewer line is replaced and upgraded before failure. This proactive work helps to ensure system reliability and supports public safety and protection of the environment.  

NIGHT WORK

No Night Work is currently scheduled. 

DAY WORK

Day work has resumed. The bore pits are currently being excavated on Tennant Avenue on both sides of the railroad tracks. This work is necessary in order to install the new sewer pipe under the railroad tracks. Only one lane of traffic in both directions will be available during working hours. This process also requires that a sewer bypass system be in place to redirect the sewer flow around the work.  The bypass system uses one pump/generator and will be operating 24/7 for approximately two weeks.  A back-up system will also be in place for redundancy.

Work installing the 27 inch sewer pipe will also continue during the day between Vineyard and Railroad. Only one lane of westbound traffic will be possible during this work. This work is expected to be complete within 3 weeks.

Additional traffic impacts will occur along Tennant Avenue for the next six months. We will post these impacts as soon as the information becomes available. Traffic control will be conducted between the hours of 8:00 a.m. to 4:00 p.m., Monday through Friday. During the work, traffic control devices will be set up and No Parking signs will be posted in advance. Access to residents, deliveries, and emergency services will be provided at all times during the roadwork. For your safety, please travel through the work zones/detours carefully or utilize alternative routes. Please plan for extra travel time when traveling through Tennant Avenue. The City appreciates your cooperation and apologizes for any inconveniences while construction is underway as there will be some noise, minor inconveniences, and traffic delays during the work.

Project Schedule

Anticipated start date: September 16, 2019
Anticipated Duration: 6 months