Crosswinds (Half-Dividend)
Project Number
SD2020-0003, SR2020-0010, EA2020-0007
Status
Processing Building Permits - The project is in the process of obtaining construction documents and permits.
Notifications
Sign up for updates about this project: Notify Me List.
Project Information
Description
The Crosswinds is a residential development project and sits on approximately 31 acres. The project proposes to construct a total of 269 new residential units, comprised of 56 single-family, 64 duets, and 149 condominium units. Of the 269 units, 40 are designated as below-market-rate (BMR) units. The new development would include the integration of open space and amenities, a pedestrian network of paseos, sidewalks, and trails. The project would require approval of a Tentative Map, Design Review Permit, and environmental review.
Site Plan
Location
The project site is bounded by Half Road to the east with planned extensions of Mission Boulevard and De Paul Drive form the northern and southern edges of the development. Assessor's Parcel Numbers: 728-30-001, 728-30-002, 728-30-003, and 728-30-004.
City Council Approvals
Planning Commission Approvals
Project Plans and Specifications
- Design Permit (Full set) revised April 29, 2023 (PDF)
- Single Family Dwelling Plans (PDF)
- Duet Plans (PDF)
- Condominium Plans (PDF)
- Clubhouse Plans (PDF)
- Preliminary Landscape Plans revised April 29, 2023 (PDF)
- Vesting Tentative Map revised April 29, 2023 (PDF)
- Option A: Preliminary Stormwater Control Plan (PDF)
- Option B: 100 Year Stormwater Retention (PDF)
Environmental Review and Documents
Final EIR
- Final Environmental Impact Report (FEIR) (PDF)
- Appendix A Draft EIR Comment Letters (PDF)
- Appendix B Tech Reports and Support Doc (PDF)
- Mitigation and Monitoring Reporting Program (PDF)
- EIR Errata (PDF)
Draft EIR
- Draft Environmental Impact Report (EIR) (PDF)
- Draft Environmental Impact Report Presentation (PDF)
- Appendix A NOP and NOP Comments (PDF)
- Appendix B Air Quality GHG Analysis (PDF)
- Appendix C Arborist Report (PDF)
- Appendix D Historic Evaluation Report (PDF)
- Appendix E Phase I ESA (PDF)
- Appendix F Noise Assessment (PDF)
- Appendix G Transportation Analysis (PDF)
- Appendix H Water Supply Assessment (PDF)
Public Notices
- State Clearinghouse Posting
- County CEQA Declaration (PDF)
- Notice of Preparation (PDF)
- Notice of Completion
Project Planner
Adam Paszkowski, adam.paszkowski@morganhill.ca.gov, 408-310-4635.
-
Adam Paszkowski
Principal PlannerPhone: 408-310-4635